Jump Main Menu. Go directly to the main content (Acces key S)
Utility section
End of section utilities
Start of main content
Energy / Transmission & distribution
Concessions / Infrastuctures
Concessions / Energy
This highly technology project will assess the potential for recovery of Liquid Petroleum Gas in gas transmission
The company has been awarded the second phase of the construction of Line 4 comprised of two awards, one for €70 M and another for €169 Mn. This second phase includes the construction of five stations and a bus terminal
The facility, in addition to integrating with the landscape, is self-sustaining and uses a treatment system that regenerates the water without using electricity, produces no sludge and requiring no maintenance.
End of main content
© Isolux Corsán 2011 Legal document (Access key 8)